In general, the changes to the text will have a vertical bar in the right margin, deleted text will have a dot,
and the changes to drawings will have a small triangle marking the revision


Description Revised Format Size
Table of Major Changes
plus the dates of the changes.  This document will be updated with the future changes.  The last changes start on Page 22.
Title Page and Miscellaneous information
Title, Forward, Where to Find Information, Contractor information, and Building Officials (Inspectors) with their Phone Numbers
Table of Contents
Drawing and Text Locations
Goldbook Text
General, Primary and Secondary Service Requirements, Metering, Power Quality, Electric Service Reliability and Secondary Services Available for Roadway, Safety, Area Lighting and Traffic Signals
Application for Installation of Underground Lines
This is an Acrobat form that you may fill in online, download the file for e-mail, or just printout
Meter Installation Request - Revised 10/17/2022:
Form used to request an electrical meter for INDOT, DPW, and other government agencies
Letter In Lieu of Electrical Inspection:
Form used in place of an electrical inspection for State of Indiana buildings, Federal buildings, services on railroad property, INDOT, DPW, and other government agencies. This is not for the use of someone who is using the "log cabin" statute or to bypass a governmental Authority Having Jurisdiction (inspector)
Letter In Lieu of Electrical Inspection for Temporary Electrical Services:
Form used in place of an electrical inspection where the Authority Having Jurisdiction does not inspect temporary electrical services. This is not for the use of someone to bypass a governmental Authority Having Jurisdiction (inspector) where inspections are made for temperory services
GB0-030 Commercial/Industrial Information Sheet:
Required data for obtaining electric service in electronic form
GB0-040 Work Management Work Sheet:
Form used to find out the expected project completion date for IPL
GB0-XXX Drawings:
District Maps, Important Notices and required data for obtaining electric service. These drawings will be updated without notice and will be omitted from the update packages.
GB1-XXX Drawings:
Generally, covers single phase overhead and underground meter fittings and cabinets
GB3-XXX Drawings:
Generally, covers three phase overhead and underground meter fittings and cabinets
GB4-XXX Drawings:
Generally, covers service drops and attachments plus temporary and pole mounted services
GB5-XXX Drawings:
Generally, covers service laterals and service points plus UG temporary, pedestal and free standing services
GB6-XXX Drawings:
Generally, covers junction cabinets and boxes for service laterals
GB7-XXX Drawings:
Generally, covers equipment pads, pole risers, standard fault currents, transfer switches, typical weatherhead box, etc.
GB8-XXX Drawings:
This group of drawings is restricted to the use of government agencies only
Change Request Form
This Change Request Form is to be used to request a change to be made to the Goldbook.  Acknowledgment of receipt or a written reply can not be made. However, all serious proposals will be considered
Complete Goldbook
This is the complete Electric Service and Meter Manual (Goldbook) in just one large file.
The following are change packages for the Goldbook.
Download only the latest one (bottom one) if your Goldbook has been kept up to date. Changes in the GB0 series of drawings and on pages i through vii are no longer included.
     
Changes Only dated January 10, 2023
This file contains all the changed pages for this edition of the Goldbook.  If your copy of the Goldbook is up to date, you will only need to replace these pages.
Changes Only dated February 10th, 2023
This file contains all the changed pages for this edition of the Goldbook.  If your copy of the Goldbook is up to date, you will only need to replace these pages.
Changes Only dated May 23rd, 2023
This file contains all the changed pages for this edition of the Goldbook.  If your copy of the Goldbook is up to date, you will only need to replace these pages.
Changes Only dated November 28, 2023
This file contains all the changed pages for this edition of the Goldbook.  If your copy of the Goldbook is up to date, you will only need to replace these pages.
AES Indiana Rules, and Regulations

AES Indiana Rates

Standards of Service

Goldbook Committee

2009 Indiana Electrical Code

NEW - Indiana Electrical Code Update Committee

2020 Indiana Residential Code